Sticky Notes to Remind | Unsplash by Kelly Sikkema
Sticky Notes to Remind | Unsplash by Kelly Sikkema
ADOT is advising drivers to plan for Grand Ave between Loop 303 & Loop 101 to be reduced to one lane in each direction.
Pavement work is scheduled nightly from 8 p.m. to 5 a.m. beginning Sun 3/12, through the morning of Mon 3/13, and again Tues 3/14 through the
morning of Fri 3/17.
Crews will mill the roadway to remove the existing asphalt, then repave and apply temporary striping to the lanes.
ADOT advises drivers to slow down and use caution around maintenance personnel and equipment in all work zones.
Original source can be found here.